top of page

Over 400 projects completed and in-progress.

Here's a look at some of the most impactful.

10 Years of Work

Our work
CULTURE

Giving Back is a cornerstone of our practice. We believe this as a firm, and at the local level. Hear from some of our team members who have made significant contributions to our community through volunteering, mentorship, advocacy, and good old-fashioned elbow grease.

10 Years of Community

NUMBERS

10 Years of Impact

Gensler is excited to celebrate our 10 year anniversary in Austin, Texas. We have watched our city flourish, and are proud to play a role in its evolution during a decade of transformative growth. As we look forward to many more years of re-drawing the skyline, improving the streetscape, and shaping the conversation around design,
we invite you to explore 10 years of our impact.
 
980px
​
490px
​
PROJECTS
WORKED ON
WORLDWIDE
​
MILLION
SQUARE FEET
 DESIGNED
GROUND UP
BUILDINGS
IN AUSTIN
​
THOUSAND BREAKFAST TACOS CONSUMED

What do the next 10 years have in store for Gensler Austin?

A few thoughts on what the future holds from the man who started it all.

Looking Ahead

Not all of our projects came to fruition.

Here's a look at some of the work that never left the drawing boards.

10 Years of Inspiration

Gensler Austin started out as a small bootstrap operation, and we've kept our rebellious spirit through 10 years of growth. We work hard, but we never forget to have fun along the way, and no one takes themselves too seriously. After all, this is Austin, and "keeping it weird" is something we don't take for granted. Take an inside look at what it's like to work at Gensler Austin.

10 Years of Culture

Keeping it Weird 

TIMELINE
COMMUNITY
LOOKING AHEAD

10 Years of Success

With over 400 projects completed or in progress, we have touched every corner of the city. From a small feasibility study to large mixed use developments, from developing a brand to public art installations, our work spans the gamut in helping to shape the fabric of the city. And although we have worked all over the world, our biggest impact has been right here at home. Use the map below to explore our impact on Austin over the past 10 years.

IMPACT

10 Years of Milestones

APRIL
Gensler announces the opening of its 25th office in Austin, with Todd Runkle leading the effort as Office Director. The office opens with five employees in One American Center. Austin joins the Houston and Dallas offices as part of the South-Central Region.
DECEMBER
Greenwater master plan awarded. As the largest private-public partnership in the history of the city, this 10-year effort aims to transform a four-block section of downtown previously occupied by the Thomas C. Green water treatment plant.

2007

2008

2010

NOVEMBER
Domain Phase III awarded. Though Gensler had been involved with master planning the initial two phases of the development, award of full planning and design services for Phase III, later renamed Domain Northside, marks a significant expansion into the Austin market, requiring an increased local presence.
FEBRUARY 
Gensler Austin blog launches on Medium. Be sure to follow us to stay in the know about our office's latest projects and community initiatives, and hear our thoughts on the state of architecture and design in Austin. 
JANUARY
Gensler Austin reaches 100 employees!

2018

MARCH
Gensler Austin moves into a new,
larger office at the W Hotel.

2011

MAY
Fairmont Austin Hotel awarded. Slated to be the largest hotel in the city, and the second largest Fairmont in the world by key count, Fairmont Austin is designed to elevate the visitor experience with world-class accommodations and luxurious amenities.
MAY
Gensler Austin hits 25 employees, and reaches critical mass to form teams for the Office Olympics. 
MARCH
Sonesta Bee Cave Hotel awarded. This project represents the first hotel in the city of Bee Cave just outside of Austin, and the first ground-up building for Sonesta Hotels. It also marks a significant addition to Gensler Austin’s hospitality portfolio.
NOVEMBER
Austin Convention Center Long-Range master plan awarded. Another major strategic effort by the City of Austin, this master plan created a new vision for the Convention Center and surrounding area, aimed at increasing convention capacity, and greatly improving associated amenities and experiences for locals
and visitors alike.

2012

2013

MAY
Instagram begins broadcasting from Deep in The Heart of Texas. Gensler Austin creates one of the first office Instagram accounts, injecting followers’ feeds with a healthy dose of photos that are local, inspiring, delicious, and weird.
MARCH
The Orchard debuts as a public art installation at SXSW, reinventing temporary public spaces for a city of festivals. Through an inventive approach, The Orchard combined small exhibits dispersed throughout the city, with a large public installation and event space. Interactive and dynamic, this new form of public art helped put a new spin on the notion of community space.
MARCH
Gensler Austin collaborates with Gensler London to design Hackney House, a tech and digital showroom at SXSW Interactive. Hackney House Austin featured products and interactive displays that showcased the best of Hackney creative talent and businesses.
JULY
Gensler Austin reaches 50 employees.
SEPTEMBER
Austin-Bergstrom International Airport Expansion awarded. As the largest public works project in Austin’s history, the expansion will consist of nine new gates, three expanded gates, and a whole range of new dining options and passenger amenities. The design will ultimately be an authentic reflection of our city– quirky, free-spirited, and “Austin weird.”

2014

NOVEMBER
Central Health Redevelopment master plan awarded. Gensler Austin's reputation as expert planners is cemented when Central Health engages us in this critical effort, which serves as a blueprint for a total transformation of the Brackenridge Campus.
APRIL
Sonesta Bee Cave Hotel opens its doors. The elegant hotel features 196 rooms, 8,000 square feet of meeting space, a pool deck and a stylish rooftop bar overlooking the neighboring Texas Hill County.
MARCH
Third + Shoal awarded. Third + Shoal brings everything we love about Austin to the city’s newest workplace. Setting a new environmental standard for the Texas capital, the project is slated to be Austin’s first LEED Platinum certified tower.

2015

AUGUST
Ed Grun joins Todd as Co-Managing Principal
of the Austin office.

2016

JANUARY
Gensler Austin leads the charge in establishing the ACE Mentor Program of Austin, an after-school program for high school students interested in careers in architecture, construction, and engineering. In just three years, the program grows to encompass over 80 registered students from 18 local high schools, and nearly 40 mentors from Austin’s top AEC firms.
MARCH
Domain 11 awarded. Our involvement with The Domain did not end with the opening of Northside; we are currently engaged on the design of three office towers which, at 16 stories, will be the tallest structures in the entire development.
MAY
SXSW Headquarters awarded. Gensler is collaborating with Pei Cobb Freed to create a state-of-the-art headquarters for South by Southwest.
JULY
Gensler Austin reaches 75 employees.
AUGUST
Launch of UPLIFT/INFILL, an internally funded research initiative exploring community-focused solutions for urban equity and homelessness in Austin and Travis County. Learn more about this effort.
APRIL
Continuing her role as Regional Managing Director, Judy Pesek transfers to the Austin office to focus on strengthening business development efforts and building client relationships, by leveraging her extensive industry expertise.
SEPTEMBER
Gensler makes its debut at Austin Fashion Week. Austin's premier lifestyle magazine, Tribeza, asked Gensler to design the runway for its annual fashion show. The challenge was to create a visual experience that teased the audience by building anticipation and framing models in unexpected ways. 
APRIL
The San Antonio studio opens. Led by Jim Shelton, AIA,
San Antonio opens with five people as a
satellite studio of Gensler Austin.
MARCH
600 Guadalupe awarded. Gensler was engaged to create a totally new urban experience in Austin: an integrated, stacked microcosm of uses joining multi-family, office, and retail. Topping out at 850 feet, the project will bring Austin to new heights as the tallest building in the city.

2017

MAY
Digital Experience Practice Area launches
(based in Austin). Led by David Kramer, with his 20+ years of digital and creative agency experience, this practice area uses technology to design memorable and personalized experiences for users of the built environment.
JULY
YETI’s global headquarters opens. With plain, honest materials and outdoor hues, the campus includes a fire pit, an outdoor band stage, a brew house, and absolutely nothing that feels ‘corporate.’ As welcoming as Austin itself, and as in earthy harmony with the Hill Country, YETI’s new home celebrates the brand’s
hometown hero status.
JULY
500 West 2nd Street opens. An integral part of the Greenwater master plan, the 29-story office tower sets new standards for commercial office building design in Austin, and acts as an anchor connecting two of Austin’s most vibrant neighborhoods –
2nd Street District and Seaholm.
NOVEMBER
SXSW Headquarters groundbreaking.
OCTOBER
Gensler Austin is awarded a commission by AIA Austin for NOPAL, a public art installation for the Emma S. Barrientos Mexican American Cultural Center.
JUNE
Gensler Austin sponsors and helps bring the Hip Hop Architecture Camp to Austin. The program offers a one-week experience designed to introduce under-represented youth to architecture, urban planning, and creative placemaking through the lens of
hip hop culture.
AUGUST
Aiming to tackle the issue of homelessness and affordable housing in Austin, our summer interns partnered with Community First! Village, a local master planned community that provides housing for the disabled and chronically homeless. Taking into consideration many of the issues residents were facing with existing housing models, they designed four modular home concepts ranging in size from 300-350 square feet.
  • Instagram - White Circle
  • Facebook - White Circle
  • Twitter - White Circle
  • Vimeo - White Circle
  • LinkedIn - White Circle

Gensler Austin 10 Year Anniversary ©2018

bottom of page